Our references

EPC PROJECTS 2008-2014

  Project Object Year Client Name
1 Tanjung Bin - Malaysia / Power Plant Construction of 2 Fly ash concrete Silos , h= 42 m Under construction Mudajaya (Malaysia)
 2 Recife - Brazil / Refinery EPC of 2 new Concrete Chimneys, h= 82 m with brick liner Ø = 5000 mm. Foundation included Under construction Alusa / Petrobras (Brazil)
 3 Narva - Estonia / Power Plant EPC of 1 Concrete Chimney, h= 200 m with one steel liner (+ option for a second one) Under commissioning Alstom Estonia (Estonia)
 4 Manjung 4 - Malaysia / Power Plant EPC of 1 Concrete Chimney, h= 200 m with one steel liner protected by borosilicate Under commissioning Mudajaya (Malaysia)
 5 Manjung 4 - Malaysia / Power Plant Construction of 1 Fly ash and 1 bottom ash concrete Silos , h= 37 and 39 m 2013 Mudajaya (Malaysia)
 6 Corse - France / Power Plant EPC of set of five new Single Skin Steel Stacks and ducting system 2013 EDF (France)
 7 Keban Agung - Indonesia / Power Plant EPC of 2 Concrete Chimneys, h= 130 m with borosilicate applied on inner surface of windshield 2012/20013 Priamanaya (Indonesia)
 8 Pedra do Sino - Brazil / Refinery EC of one new Single Skin Steel Stack, h= 90 m 2013 Cimento Tupi (Brazil)
 9 Hong Kong - China / Waste Treatment Plant EPC of four new Single Skin Steel Stacks, h= 55 m 2012 Veolia (France)
 10 Rostov - Russia / Glass Factory EPC of new Double Skin Steel Stack, h= 100 m 2012 GUARDIAN GLASS (USA)
 11 Pisa - Italy / Glass Factory EPC of new Double Skin Steel Stack, h= 55 m 2011 Saint Gobain (France)
 12 Baku - Azerbaijan / Waste Treatment Plant EPC of two new Double Skin Steel Stack, h= 60 m 2011 LAB (France)
 13 Poland / Sulphur Stack EPC of new Double Skin Steel Stack, h= 60 m with refractory lining 2011 KTI TECNIMONT (Italy)
 14 Arques - France / Waste Treatment Plant EPC of new Double Skin Steel Stack, h= 48 m 2011 LAB (France)
 15 Serbia / Sulphur stack EPC of new Double Skin Steel Stack, h= 60 m 2011 JOHN ZINK (Germany)
 16 France / Insulation Industry EPC of three new single wall and Double Skin Steel Stacks, h= 38 m, 45 m and 75 m 2010 EWK (Germany)
 17 Koniambo - New Caledonia / Nickel Plant EPC of new Concrete/Steel Chimney, h= 135 m and 2 liners - Foundation included 2010 TECHNIP (France)
 18 Guadeloupe/Waste Treatment Plant EPC of new Double Skin Steel Stack, h= 47 m with FRP liner 2010 LAB (France)
 19 Turano Lodigiano - Italy / Power Plant EPC of new Concrete Chimney, h= 100 m and 2 steel liners Ø= 6100 mm 2009-2010 ANSALDO (Italy)
 20 Sao Paulo - Brazil / Glass Factory EPC of new Concrete Chimney, h= 103 m with brick liner Ø= 6400 mm. Foundation included 2009 GUARDIAN GLASS / CTE (France)
 21 Obeikan - Saudi Arabia/ Glass Factory EPC of new Double Skin Steel Stack, h= 100 m - Foundation included 2009 OBEIKAN GLASS COMPANY (KSA)
 22 France / Concrete Production Unit EPC of new Single Skin Steel Stack, h= 82 m 2009 HOLCIM (France)
 23 France / Refinery/ Sulphur Incinerator Plant EPC of new Double Skin Steel Stack, h= 75 m 2009 JE JACOBS / INEOS (France)
 24 France / Insulation Industry EPC of two new Steel Stack, h=38 m and 45 m, Ducting, fans, noise absorber, precipitator etc 2009 ISOVER (France)
 25 France / Refinery (Sulphur Incinerator Plant) EPC of new Double Skin Steel Stack, h= 90 m and smoke ducting 2009 TOTAL (France)
 26 Algeria / Power Plant EPC of four new Multiflue Single Skin Steel Stack, h= 45 m 2008 IHI HEAVY INDUSTRY (Japan)
 27 France / Glass Factory EPC of new Double Skin Steel Stack, h= 60 m 2008 KERAGLASS (France)